Odas Elektrik Üretim Sanayi Ticaret A.S.: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 August 2022

13 August 2022

9 August 2022

  • curprev 21:5821:58, 9 August 2022 >Paris 951 bytes +951 Created page with "Odas Elektrik Üretim Sanayi Ticaret A.S., together with its subsidiaries, produces and sells electricity by natural gas combined cycling in Turkey and internationally. The company operates a natural gas combined cycle power plant with an installed capacity of 140 MW; a solar energy power plant with an installed capacity of 0.25 MW; a hydroelectric power plant with an installed capacity of 8.2 MW; and a thermal power plant with an installed capacity of 340 MW. It also pr..."